Home   l  Partners   l  Your Inquiries  l  Site Index    
Custom Yachts, Custom Yacht Builders | TIFFANY YACHTS
Custom Yacht Builders in Virginia
 

Click photos to enlarge

Tiffany Classic 38 Progress of Production

Below are some pictures documenting the construction of the Tiffany 38.  Unfortunately the 38 never made it to completion as a devastating fire at Tiffany Yachts on February 2, 2010 destroyed the main building and the Tiffany 38.  If you are interested in building a custom cruising yacht like the Tiffany 38 please give us a call.  We would love to have a downeast style Tiffany brought to completion.
      

Stations for Jig
Mold for the hull is ready to lay up
Glassing in stringers
Bulkhead is installed
V-Berth Under Construction
Stations for Jig

Mold for the hull is ready to lay up

Glassing in stringers

Bulkhead is installed

V-berth
Forward Stateroom is set up on the platform and later put in place
Cabin on the Platform
Window trim and teak are installed on cabin
Teak on Dash
Bamboo veneer and teak trim on v-berth
Forward Stateroom is set up on the platform and later put in place
Cabin

Window trim and teak are installed on cabin

Teak on dash

Bamboo veneer and teak trim on v-berth

Getting ready to lift cabin onto hull
Setting Cabin
Almost There
Ready to Glass Cabin and Hull together
Aft View Together

Getting ready to lift cabin onto hull

Setting cabin

Almost there

Ready to glass together

Aft view

Bamboo veneer on walls and more teak trim
Hanging Locker
Teak handrail incorporated into trim
First Time in the Water
View of the Bow in the Water

Bamboo veneer on walls and more teak trim

Hanging locker

Teak handrail incorporated into trim

Draked Style Transom

Doesn't she look nice

Port Side in the Water She sits so nicely in the water Vernon beginning the galley cabinet Glassing the port seat The helm and navigator seats

Please excuse the old boat in the background

Trunk Cabin

Vernon beginning the galley cabinet

Glassing the port seat

The helm and navigator seats

The electrical panel is in the helm seat Dovetail joints on the drawer Teak sink for the gallery after being cut by the CNC router Starboard Seat Forward bulkhead in v-berth. Several coats of clear gloss polyurethane have been applied

The electrical panel is in the helm seat

Dovetail joints on the drawer

Teak sink for the gallery after being cut by the CNC router

Starboard seat

Forward bulkhead in v-berth. Several coats of clear gloss polyurethane have been applied

All the trim for the v-berth has been built and the finish is being applied Mold for Bow Pulpit Setting the engine Setting the engine with the Forklift Engine, Generator, and Tanks in Place

All the trim for the v-berth has been built and the finish is being applied

Mold for bow pulpit

Setting the Engine

Setting the Engine

Engine, Generator and Tanks in Place

Helm Seats and Galley Close To Complete Just Painted the Hull Alexseal Pegasus Gray Looks Great! January 28, 2010 - Hull Painted February 2, 2010 Fire Burns through the main building including the Tiffany 38  

 

Helm Seats and Galley Close To Complete

Just Painted the Hull Alexseal Pegasus Gray Looks Great!

January 28, 2010

February 2, 2010 Fire Burns through the main building including the Tiffany 38

    
Tiffany Yachts, Inc. 2355 Jessie Dupont Memorial Highway, Burgess, VA 22432   Ph: (804) 453-3464   Fax: (804) 453-3837   l   info@tiffanyyachtsinc.com


 
Virginia Web Designers VISIONEFX