The electrical
panel is in the helm seat
|
Dovetail joints
on the drawer
|
Teak sink for the
gallery after being cut by the CNC router
|
|
Forward bulkhead
in v-berth. Several coats of clear gloss
polyurethane have been applied
|
All the trim for
the v-berth has been built and the finish
is being applied
|
|
|
|
Engine, Generator and Tanks in Place
|
|
Helm Seats and Galley Close To Complete |
Just Painted the Hull Alexseal Pegasus Gray Looks Great!
|
|
February 2, 2010 Fire Burns through the main building including the Tiffany 38
|
|